Location:首页>Rigs>Water Well Rigs
Water Well Rigs Geological Rigs Mining Rigs Engineering Rigs Oil & Gas Exploration Rigs

-Water Well Rigs-

FSL400RC Water Well Rigs

🔍 Details of Model:FSL400RC

FSL400 Multi-functional Water Well Drilling Machine — Technical Parameters
Basic Specifications
Weight11 T
Drilling Depth400 m
Drill Diameter105–305 mm
Lifting force22 T
Fast Lifting Speed20 m/min
Fast Feeding Speed32 m/min
Moving Speed2.5 km/h
Uphill angle21°
Drilling Performance
Rotary Torque8000 / 4000 N·m
Rotary Speed75 / 150 r/min
Penetration Efficiency10–35 m/h
Air Pressure1.2–3.5 MPa
Air consumption16–55 m³/min
Dimensions & Power
Dimension7 × 1.85 × 2.86 m
EngineYuchai
Host power92 kW
Drill System
Winch lifting force1.5 T
Leg Stroke1.6 m
Drill pipe length3 m
RC Drill pipe diameter89 / 102 mm
Working Conditions & Method
Working Angle45°, 90°
Working conditionUnconsolidated formation and bedrock
Drilling methodTop drive hydraulic rotary & pushing, DTH hammer or mud drilling
Matched DTH hammerMedium and high air pressure series

Videos of FSL400RC

Before You Shop

After-Sales Support

Always a pre-production sample before mass production;always final inspection is done before shipment;and our main unit has a one-year warranty, during which all damaged accessories can be replaced with new ones. We provide machine installation and operation videos.Our machines have a 12-month warranty, during which the core components are replaced at the factory price!

Payment method

30% deposit, 70% before shipment.

How to inspect the goods?

1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.

How long is your delivery cycle?

1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.

Can you do OEM for me?

We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.