








| FSL600 Multi-functional Water Well Drilling Machine — Technical Parameters | |
|---|---|
| Basic Specifications | |
| Weight | 12.5 T |
| Drilling Depth | 600 m |
| Drill Diameter | 105–450 mm |
| Lifting force | 29 T |
| Fast Lifting Speed | 29 m/min |
| Fast Feeding Speed | 33 m/min |
| Moving Speed | 3.5 km/h |
| Uphill angle | 21° |
| Drilling Performance | |
| Rotary Torque | 12000 / 6000 N·m |
| Rotary Speed | 75 / 150 r/min |
| Penetration Efficiency | 10–35 m/h |
| Air Pressure | 1.6–6 MPa |
| Air consumption | 16–75 m³/min |
| Dimensions & Power | |
| Dimension | 7 × 2.1 × 2.9 m |
| Engine | Cummins |
| Host power | 132 kW |
| Drill System | |
| Winch lifting force | 2.5 T |
| Leg Stroke | 1.7 m |
| Drill pipe length | 3 m |
| RC Drill pipe diameter | 102 / 114 mm |
| Working Conditions & Method | |
| Working Angle | 45°, 90° |
| Working condition | Unconsolidated formation and bedrock |
| Drilling method | Top drive hydraulic rotary & pushing, DTH hammer or mud drilling |
| Matched DTH hammer | Medium and high air pressure series |
Always a pre-production sample before mass production;always final inspection is done before shipment;and our main unit has a one-year warranty, during which all damaged accessories can be replaced with new ones. We provide machine installation and operation videos.Our machines have a 12-month warranty, during which the core components are replaced at the factory price!
30% deposit, 70% before shipment.
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.
We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.