Location:首页>Rigs>Water Well Rigs
Water Well Rigs Geological Rigs Mining Rigs Engineering Rigs Oil & Gas Exploration Rigs

-Water Well Rigs-

SL1000S Water Well Rigs

🔍 Details of Model:SL1000S

SL1000/SL1000S Multi-functional Water Well Drilling Machine — Technical Parameters
Performance Parameters
Max drilling depth1000 m
Drilling diameter105–800 mm
Air pressure1.6–8 MPa
Air consumption16–96 m³/min
Drill pipe length7 m
Drill pipe diameter114 mm
Axial pressure8 T
Lifting force51 / 52 T
Fast lifting speed30 m/min
Feed speed61 m/min
Max rotary torque26000 / 13000 Nm
Max rotary speed70 / 140 r/min
Auxiliary System
Big auxiliary winch lifting force-
Small auxiliary winch lifting force2.5 T
Jacks stroke1.7 m
Efficiency & Mobility
Drilling efficiency10–35 m/h
Moving speed5 Km/h
Uphill angle21°
Dimensions & Weight
Weight of the rig17.8 T
Dimension7.3 × 2.25 × 2.75 m
Engine
EngineCummins 194kw

Videos of SL1000S

Before You Shop

After-Sales Support

Always a pre-production sample before mass production;always final inspection is done before shipment;and our main unit has a one-year warranty, during which all damaged accessories can be replaced with new ones. We provide machine installation and operation videos.Our machines have a 12-month warranty, during which the core components are replaced at the factory price!

Payment method

30% deposit, 70% before shipment.

How to inspect the goods?

1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.

How long is your delivery cycle?

1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.

Can you do OEM for me?

We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.