Location:首页>Rigs>Water Well Rigs
Water Well Rigs Geological Rigs Mining Rigs Engineering Rigs Oil & Gas Exploration Rigs

-Water Well Rigs-

SL400S Water Well Rigs

🔍 Details of Model:SL400S

SL400S Multi-functional Water Well Drilling Machine — Technical Parameters
Performance Parameters
Max drilling depth400 m
Drilling diameter105–325 mm
Air pressure1.2–3.5 Mpa
Air consumption16–55 m³/min
Drill pipe length6 m
Drill pipe diameter89 / 102 mm
Axial pressure4 T
Lifting force22 T
Fast lifting speed29 m/min
Fast feeding speed56 m/min
Max rotary torque8000 / 4000 Nm
Max rotary speed75 / 150 r/min
Auxiliary System
Big auxiliary winch lifting force-
Small auxiliary winch lifting force1.5 T
Jacks stroke1.6 m
Efficiency & Mobility
Drilling efficiency10–35 m/h
Moving speed2.5 Km/h
Uphill angle21°
Dimensions & Weight
Weight of the rig9.8 T
Dimension6.26 × 1.85 × 2.43 m
Engine
EngineYuchai Stock 92kw

Videos of SL400S

Before You Shop

After-Sales Support

Always a pre-production sample before mass production;always final inspection is done before shipment;and our main unit has a one-year warranty, during which all damaged accessories can be replaced with new ones. We provide machine installation and operation videos.Our machines have a 12-month warranty, during which the core components are replaced at the factory price!

Payment method

30% deposit, 70% before shipment.

How to inspect the goods?

1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.

How long is your delivery cycle?

1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.

Can you do OEM for me?

We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.