ShanBo
WR180E Crawler Water Well Drilling Rig Overall Display
WR180E 180 m Drilling Depth Small Well Drilling Equipment
WR180E Rural Water Supply and Farmland Irrigation Drilling Rig
WR180E Compact Crawler Water Well Drilling Rig Appearance
WR180E Crawler Water Well Drilling Rig Overall Display
WR180E 180 m Drilling Depth Small Well Drilling Equipment
WR180E Rural Water Supply and Farmland Irrigation Drilling Rig
WR180E Compact Crawler Water Well Drilling Rig Appearance

WR180E

Crawler-Mounted Water Well Drilling Rig

  • Drilling Depth (m)
    180
  • Drilling Diameter (mm)
    90-230
  • Lifting Capacity (T)
    16
WR180E Crawler-Mounted Water Well Drilling Rig
WR180E Crawler-Mounted Water Well Drilling Rig

Product Details:WR180E Crawler-Mounted Water Well Drilling Rig

💧 WR180E 180 m Cost-Effective Small Crawler Water Well Drilling Rig

The WR180E is a compact crawler water well drilling rig designed for rural water supply, farmland irrigation, orchards, farms, and small engineering water well construction. The equipment has a maximum drilling depth of 180 m and a drilling diameter of 90–230 mm. It is equipped with a 28 HP Changchai diesel engine, 16 T lifting force, and a 1.5 m mast. Its overall structure is lightweight and easy to transport, making it more suitable for conventional well drilling projects with limited budgets, scattered hole locations, and frequent site transfers.

💰 The E Series Emphasizes Low Investment and Daily Practicality

The E in WR180E represents a cost-effective configuration. This model does not pursue the high power and extra-large hole diameter of large deep well equipment. Instead, its power, lifting, and traveling systems are configured around common 180 m-class water well requirements, making it suitable for small drilling teams, agricultural users, and regional construction teams to control initial equipment investment.

📏 180 m Drilling Depth Covers More Shallow to Medium-Depth Groundwater Projects

Compared with small rigs in the 120 m class, the 180 m maximum drilling depth provides greater depth margin for water exploration and can cover more shallow to medium-depth groundwater projects in rural, hilly, and agricultural areas. The actual completed well depth should still be determined according to the local groundwater level, aquifer position, hole diameter, and construction process.

🏠 Rural Domestic Water and Household Water Wells

The WR180E can be used for household water wells, village domestic water wells, and small public water intake projects. The 90–230 mm drilling diameter can be selected according to well casing size, submersible pump specifications, and expected water yield, making it suitable for rural projects that are relatively sensitive to equipment mobility and construction cost.

🌾 Farmland Irrigation, Orchards, and Greenhouse Water Supply

Farmland, orchard, greenhouse, and nursery projects often have many hole locations and scattered construction sites. The crawler chassis makes it easy for the equipment to move along field roads and general unpaved sites. The 180 m-class drilling depth also provides a wider application range than smaller equipment.

🐄 Farm and Ranch Water Use

Farms and ranches have stable demand for drinking water, cleaning, and daily production water sources. The WR180E uses diesel power and does not rely on a fixed power grid, so it can be used for small-scale groundwater development in remote agricultural and livestock sites.

⚙️ 28 HP Changchai Diesel Engine Suitable for Compact Equipment

The equipment is equipped with a 28 HP Changchai diesel engine to provide power for the hydraulic system, rotation, and crawler traveling. This power configuration is more oriented toward economy and practicality and is suitable for conventional shallow to medium-depth water well construction. During continuous operation, the engine oil, cooling, fuel system, and air filter should be checked according to regulations.

💪 16 T Lifting Force Meets Conventional Tripping Requirements

The 16 T lifting force can be used for normal drill pipe tripping, drilling tool recovery, and handling some downhole tools. If abnormal pulling resistance, hole wall shrinkage, or poor cuttings removal occurs, the formation and downhole conditions should be judged first. It is not recommended to rely solely on maximum lifting force for forced handling.

🔄 40–70 rpm Rotation Speed Suitable for Conventional Drilling

The rotation speed range is 40–70 rpm and can be adjusted according to the drill pipe, drill bit, and formation conditions. Soil layers, weathered layers, and alternating soft and hard formations have different requirements for rotation and feed. Operators should adjust parameters in a timely manner according to drilling resistance, cuttings removal, and hole wall stability.

🔩 50 / 60 / 76 mm Drill Pipe Configuration Is More Flexible

The WR180E can use 50 mm, 60 mm, and 76 mm drill pipes, with drill pipe lengths of 1.5 m and 2.0 m. Shorter drill pipes facilitate manual operation, transportation, and construction in narrow sites, and are also more in line with the intended use of a small crawler drilling rig.

🪜 1.5 m Mast Suitable for Compact Sites and Transportation

The 1.5 m mast keeps the whole machine at a lower working height and smaller transport volume, making it suitable for courtyards, orchards, small construction sites, and rural roads where space is limited. A shorter mast also means the drill pipe replacement frequency will be higher than that of long-stroke models, so this machine is more oriented toward flexibility and economy rather than pursuing the continuous drilling efficiency of large equipment.

🚜 1.8 T Whole Machine Facilitates Site Transfer and Transportation

The whole machine weighs about 1.8 T, with overall dimensions of about 3000 × 1300 × 1700 mm, making it suitable for transfer between construction sites using small transport vehicles. For users with multiple hole locations, small-scale projects, and ordinary rural road conditions, the lighter whole machine can reduce transportation and loading/unloading difficulty.

🟤 Construction in Soil, Clay, and Gravel Layers

The key to construction in loose formations is maintaining hole wall stability. Soil layers, clay, sand layers, and gravel layers may experience hole collapse, diameter shrinkage, and drill burial. Suitable drilling tools and hole stabilization methods should be selected according to formation conditions, and normal cuttings removal should be maintained.

🪨 Weathered Rock and Alternating Soft and Hard Formations

In weathered rock and alternating soft and hard formations, operating parameters should be adjusted according to rock hardness, rotation load, and drilling speed. If the project is mainly in complete high-hardness rock layers, or if construction is long-term near the maximum drilling depth, the matching of drilling tools, power, and equipment class should be reevaluated.

WR180E Detail Image 1

⚠️ Construction and Maintenance Precautions

Before starting work, check the crawler, mast, hydraulic lines, drill pipe connections, and power system; during construction, continuously observe rotation resistance, cuttings removal, and equipment temperature; after completion, promptly clean mud and debris, and check drill pipe threads, hydraulic joints, and wearing parts. During site transfer and transportation, the equipment should be properly secured.

📌 Parameter Notes

According to the user's latest confirmation, this product is uniformly designated as WR180E on this page, and the maximum drilling depth is 180 m; other parameters remain unchanged from the original data configuration. Drill pipe lengths are 1.5 m and 2.0 m according to the user's supplementary information.

Due to differences in actual geological conditions, downhole tools, drilling angle, and operating methods, the final drilling efficiency, drilling depth, and completed well results should be based on on-site working conditions.

📊 Main Technical Parameters

Parameter ItemParameter Value
Basic Parameters
Product ModelWR180E
Equipment TypeCost-effective small crawler water well drilling rig
Maximum Drilling Depth180 m
Drilling Diameter90–230 mm
Mast Height1.5 m
Power System
Engine TypeDiesel power
Engine BrandChangchai
Engine Power28 HP
Drill Pipe Configuration
Drill Pipe Diameter50 / 60 / 76 mm
Drill Pipe Length1.5 / 2.0 m
Rotation and Lifting
Rotation Speed40–70 rpm
Lifting Force16 T
Working Pressure1.7–3.0 MPa
Traveling and Whole Machine Parameters
Traveling Speed2.5 km/h
Overall Dimensions3000 × 1300 × 1700 mm
Whole Machine Weight1.8 T
Typical Applications
Rural Water SupplyHousehold water wells, village domestic water, and small public water intake wells
Farmland IrrigationIrrigation wells for farmland, orchards, greenhouses, and nurseries
Livestock Water UseWater supply for farms, ranches, and remote agricultural projects
Small Engineering Water WellsConstruction sites, farms, and general groundwater development

Online Inquiry