Integrated Core Drilling Rig
CR1000I

- Drilling Depth (m)
- 1000
- Coring Capacity (m)
- BQ 1200 / NQ 1000 / HQ 500
- Pullback Force (kN)
- 185

Integrated Core Drilling Rig

Integrated Core Drilling Rig

Integrated Core Drilling Rig

Integrated Core Drilling Rig

Integrated Core Drilling Rig


We are a professional drilling equipment manufacturer specializing in the research and development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, down-the-hole drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.
© 2026 Shandong Hengjianhang Construction Machinery Co., Ltd. All rights reserved.