Photovoltaic Pile Driver
PV390

- Drilling Depth (m)
- 6
- Drilling Diameter (mm)
- 80-600
- Maximum Torque (N·m)
- 13000

Photovoltaic Pile Driver

Photovoltaic Pile Driver

Photovoltaic Pile Driver


We are a professional drilling equipment manufacturer specializing in the research and development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, down-the-hole drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.
© 2026 Shandong Hengjianhang Construction Machinery Co., Ltd. All rights reserved.