Integrated Down-the-Hole Drilling Rig
DTH30C

- Drilling Depth (m)
- 30
- Drilling Diameter (mm)
- 76-280

Integrated Down-the-Hole Drilling Rig


We are a professional drilling equipment manufacturer specializing in the research and development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, down-the-hole drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.
© 2026 Shandong Hengjianhang Construction Machinery Co., Ltd. All rights reserved.