ShanBo
Location:Home>Drilling Rigs>Down-the-Hole Drilling Rig>Integrated Down-the-Hole Drilling Rig

-Integrated Down-the-Hole Drilling Rig-

-Down-the-Hole Drilling Rig-

Integrated Down-the-Hole Drilling Rig

DTH30C

DTH30C
Drilling Depth (m)
30
Drilling Diameter (mm)
76-280