ShanBo
Location:Home>Drilling Rigs>Water Well Drilling Rig>Trailer-Mounted Water Well Drilling Rig

-Trailer-Mounted Water Well Drilling Rig-

-Water Well Drilling Rig-

Trailer-Mounted Water Well Drilling Rig

WRTR1000

WRTR1000
Drilling Depth (m)
1000
Rotary Table Opening (mm)
660
Maximum Mast Load (T)
60

Trailer-Mounted Water Well Drilling Rig

WRTR600

WRTR600
Drilling Depth (m)
600
Maximum Drilling Diameter (mm)
500
Maximum Swivel Load (T)
30