Photovoltaic Pile Driver

- Drilling Depth (m)
- 6
- Drilling Diameter (mm)
- 80-600
- Maximum Torque (N·m)
- 13000
Integrated Down-the-Hole Drilling Rig

- Drilling Depth (m)
- 30
- Drilling Diameter (mm)
- 76-280
Split-Type Core Drilling Rig

- Drilling Depth (m)
- 1000
- Coring Capacity (m)
- BQ 1150 / NQ 1000 / HQ 550
- Pullback Force (kN)
- 130
Integrated Core Drilling Rig

- Drilling Depth (m)
- 1000
- Coring Capacity (m)
- BQ 1200 / NQ 1000 / HQ 500
- Pullback Force (kN)
- 185
Tunnel Drilling Rig

- Drilling Depth (m)
- 800
- Coring Capacity (m)
- BQ 920 / NQ 800 / HQ 380
- Pullback Force (kN)
- 130
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 1000
- Drilling Diameter (mm)
- 105-800
- Lifting Capacity (T)
- 52
Reverse Circulation Drilling Rig

- Drilling Depth (m)
- 400
- Drilling Diameter (mm)
- 105-305
- Lifting Capacity (T)
- 22
Trailer-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 1000
- Rotary Table Opening (mm)
- 660
- Maximum Mast Load (T)
- 60
Truck-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 1200
- Drilling Diameter (mm)
- 105-900
- Lifting Capacity (T)
- 61
Photovoltaic Pile Driver

- Drilling Depth (m)
- 6
- Drilling Diameter (mm)
- 80-600
- Maximum Torque (N·m)
- 13000
Split-Type Core Drilling Rig

- Drilling Depth (m)
- 1200
- Coring Capacity (m)
- BQ 1500 / NQ 1200 / HQ 700
- Pullback Force (kN)
- 130
Integrated Core Drilling Rig

- Drilling Depth (m)
- 1200
- Coring Capacity (m)
- BQ 1600 / NQ 1200 / HQ 700
- Pullback Force (kN)
- 160
Reverse Circulation Drilling Rig

- Drilling Depth (m)
- 500
- Drilling Diameter (mm)
- 105-400
- Lifting Capacity (T)
- 25
Trailer-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 600
- Maximum Drilling Diameter (mm)
- 500
- Maximum Swivel Load (T)
- 30
Truck-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 600
- Drilling Diameter (mm)
- 140-450
- Lifting Capacity (T)
- 37
Photovoltaic Pile Driver

- Drilling Depth (m)
- 6
- Drilling Diameter (mm)
- 80-600
- Maximum Torque (N·m)
- 13000
Split-Type Core Drilling Rig

- Drilling Depth (m)
- 600
- Coring Capacity (m)
- BQ 760 / NQ 600 / HQ 280
- Pullback Force (kN)
- 100
Integrated Core Drilling Rig

- Drilling Depth (m)
- 1600
- Coring Capacity (m)
- BQ 2000 / NQ 1500 / HQ 850
- Pullback Force (kN)
- 185
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 1500
- Drilling Diameter (mm)
- 105-1000
- Lifting Capacity (T)
- 80
Reverse Circulation Drilling Rig

- Drilling Depth (m)
- 500
- Drilling Diameter (mm)
- 140-400
- Lifting Force (kN)
- 300
Truck-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 1000
- Drilling Diameter (mm)
- 105-800
- Lifting Capacity (T)
- 52
Split-Type Core Drilling Rig

- Drilling Depth (m)
- 800
- Coring Capacity (m)
- BQ 920 / NQ 800 / HQ 380
- Pullback Force (kN)
- 130
Integrated Core Drilling Rig

- Drilling Depth (m)
- 600
- Coring Capacity (m)
- BQ 800 / NQ 600 / HQ 300
- Pullback Force (kN)
- 130
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 1200
- Drilling Diameter (mm)
- 105-900
- Lifting Capacity (T)
- 60
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 180
- Drilling Diameter (mm)
- 90-230
- Lifting Capacity (T)
- 16
Reverse Circulation Drilling Rig

- Drilling Depth (m)
- 600
- Drilling Diameter (mm)
- 105-450
- Lifting Capacity (T)
- 29
Integrated Core Drilling Rig

- Drilling Depth (m)
- 800
- Coring Capacity (m)
- BQ 1000 / NQ 800 / HQ 500
- Pullback Force (kN)
- 152
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 200
- Drilling Diameter (mm)
- 140-254
- Lifting Capacity (T)
- 13
Reverse Circulation Drilling Rig

- Drilling Depth (m)
- 600
- Drilling Diameter (mm)
- 105-450
- Lifting Capacity (T)
- 29
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 220
- Drilling Diameter (mm)
- 140-254
- Lifting Capacity (T)
- 13
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 300
- Drilling Diameter (mm)
- 105-325
- Lifting Capacity (T)
- 15
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 300
- Drilling Diameter (mm)
- 140-325
- Lifting Capacity (T)
- 18
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 350
- Drilling Diameter (mm)
- 105-350
- Lifting Capacity (T)
- 16
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 400
- Drilling Diameter (mm)
- 105-325
- Lifting Capacity (T)
- 22
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 400
- Drilling Diameter (mm)
- 105-325
- Lifting Capacity (T)
- 22
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 450
- Drilling Diameter (mm)
- 105-400
- Lifting Capacity (T)
- 20
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 500
- Drilling Diameter (mm)
- 105-400
- Lifting Capacity (T)
- 30
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 500
- Drilling Diameter (mm)
- 140-350
- Lifting Capacity (T)
- 26
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 600
- Drilling Diameter (mm)
- 105-400
- Lifting Capacity (T)
- 35
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 750
- Drilling Diameter (mm)
- 105-450
- Lifting Capacity (T)
- 40
Crawler-Mounted Water Well Drilling Rig

- Drilling Depth (m)
- 260
- Drilling Diameter (mm)
- 140-305
- Lifting Capacity (T)
- 15