ShanBo
CR1200P Deep Core Drill Rig Overall Layout
CR1200P Split Module Transport and On-Site Assembly
CR1200P Power Head and Hydraulic Control Details
CR1200P Winch and Mud System Configuration
CR1200P Deep Core Drill Rig Overall Layout
CR1200P Split Module Transport and On-Site Assembly
CR1200P Power Head and Hydraulic Control Details
CR1200P Winch and Mud System Configuration

CR1200P

Split-Type Core Drilling Rig

  • Drilling Depth (m)
    1200
  • Coring Capacity (m)
    BQ 1500 / NQ 1200 / HQ 700
  • Pullback Force (kN)
    130
CR1200P Split-Type Core Drilling Rig
CR1200P Split-Type Core Drilling Rig

Product Details:CR1200P Split-Type Core Drilling Rig

⛏️ CR1200P 1200m Portable Split Full Hydraulic Core Drill Rig

The CR1200P is primarily used for deep exploration tasks in high mountains, forests, and remote mining areas. It combines 1200m-class core drilling capability with split transport, suitable for projects where the ore body has been preliminarily controlled but deep resources still need further verification, and where large crawler rigs cannot reach the drill site due to road conditions.

🌐 1200m-Class Positioning for Deeper Resource Control

Reference drilling depths: BQ 1500m, NQ 1200m, HQ 700m. Compared to 600m and 800m-class equipment, the CR1200P is more suitable for drilling to verify downward extension, peripheral expansion, and resource upgrade of ore bodies, as well as testing secondary mineralization zones, deep structures, or deeper anomalies.

CR1200P Detail Image 5

🥇 Deep Gold Mine and Mine Replacement Resource Exploration

When producing mines seek replacement resources, they often need to drill from the periphery of existing mining areas or mountain platforms to depth. The CR1200P can drill at angles from 45° to 90°, using deep core to determine whether the ore body continues downward, providing geological evidence for mine expansion, reserve increase, and deep planning.

🟠 Deep Verification of Large Copper and Polymetallic Systems

Large copper and polymetallic deposits often feature thick overburden, complex alteration, and multi-phase tectonics. 1200m-class boreholes can traverse a larger vertical range, and continuous core recovery can be used to analyze mineralization centers, rock contacts, alteration zoning, and fault controls.

CR1200P Detail Image 2

🏔️ Split Structure Lowers Equipment Access Barriers for Remote Projects

Deep drilling rigs typically have larger power and hydraulic systems, and if transported as a whole, they impose high demands on roads and lifting equipment. The CR1200P is divided into multiple functional modules that can be transported in batches according to site transport capacity. Construction organization still requires advance planning for slopes, lifting points, water supply, power, and spare parts replenishment.

🔄 1360 N·m Torque and 1500 rpm Speed Range

The power head uses variable displacement piston motors and gear transmission, with maximum torque of 1360 N·m, maximum speed of 1500 rpm, and supports swing or side shift. Different stages of deep drilling have varying torque and speed requirements; operators should dynamically adjust based on rock type, hole diameter, and drill string load.

CR1200P Detail Image 4

💪 130 kN Lifting Force Cannot Replace Good Hole Management

The CR1200P has a feed force of 67 kN and a lifting force of 130 kN. For 1200m-class boreholes, controlling hole deviation, maintaining hole wall stability, and reducing drill pipe friction are more important than simply increasing lifting force. If tripping resistance continues to increase, timely circulation, tripping inspection, or hole wall treatment should be performed.

🧵 1400m Rope Capacity Suitable for Deep Continuous Coring

The winch has a rope capacity of 1400m using 6mm wire rope, with a hoisting speed of 116 m/min. In deep holes, the inner tube lifting distance is long, and the wire rope is used frequently. Therefore, inspection and replacement records should be established, with periodic checks for broken wires, wear, indentations, and rope end connections.

CR1200P Detail Image 3

🛢️ 250 L/min Main Pump Supports High-Load Hydraulic System

The main pump flow is 250 L/min, pressure 25 MPa, main oil tank 250L, and control is manual plus pilot. The large hydraulic flow is beneficial for continuous deep drilling but also requires greater attention to hydraulic oil filtration, temperature control, and high-pressure hose maintenance.

💧 150 L/min Mud Flow Suitable for Longer Boreholes

The mud pump flow is 150 L/min, pressure 7 MPa. In deep holes, cuttings transport distance is long, and mud also serves to cool, lubricate, and stabilize the hole wall. When encountering deep lost circulation, water-bearing fractures, or fractured zones, mud properties should be adjusted promptly based on returns and pump pressure changes.

CR1200P Detail Image 6

⚡ 147 kW-Class Diesel Power and Electric Options

Diesel engine power requirement is ≥147 kW, and an electric configuration of 30 kW × 4 motors is also available. Remote field projects prioritize independent power and fuel supply; mine fixed platforms with stable power can choose electric configuration based on energy costs and maintenance conditions.

🪨 Deep Faults, Fractured Zones, and Lost Circulation Layers

When deep holes enter fault zones, core fragmentation, abnormal pump pressure, reduced returns, or hole wall spalling may occur. In such cases, mechanical impact should be reduced, runs shortened, and circulation anomalies addressed promptly. For severe lost circulation, casing, plugging, or staged wall stabilization should be used rather than blindly pursuing footage.

CR1200P Detail Image 1

🌍 Typical Applications

The CR1200P can be used for deep exploration of gold, copper, lithium, nickel, iron, lead-zinc, and polymetallic mines, as well as for deep geological surveys, structural verification, mine periphery expansion, and resource upgrade projects in remote areas.

🛡️ Remote Deep Hole Projects Should Prioritize Spare Parts Management

In remote mining areas, waiting time for parts after downtime is costly. The site should stock common seals, filters, quick couplings, wire rope wear parts, drilling tools, and mud materials, and establish regular maintenance plans for power, hydraulic, winch, and clamp systems.

⚠️ Deep Drilling Precautions

Before starting drilling, confirm platform stability, hole azimuth, drill pipe inventory, water source, and power supply; after module assembly, check hydraulic connections and mechanical joints one by one; during deep drilling, continuously record torque, pump pressure, returns, and tripping resistance, and address any trend anomalies promptly.

Since actual geological conditions, downhole tools, hole angles, and operating methods vary, final drilling efficiency, depth, and core recovery should be based on site conditions.

📊 Main Technical Parameters

ParameterValue
Drilling Capacity
BQ reference depth1500 m
NQ reference depth1200 m
HQ reference depth700 m
Hole angle45°–90°
Applicable rod length1 / 1.5 m
Power System
Power typeDiesel / Electric
Diesel engine power≥147 kW
Diesel engine brandKubota / Cummins / Yunnei / Yuchai (optional)
Electric motor configuration30 kW × 4
Motor speed3000 / 1450 rpm
Hydraulic System
Main pump flow250 L/min
Main pump pressure25 MPa
Auxiliary pump flow10 L/min
Auxiliary pump pressure17 MPa
Main oil tank capacity250 L
Control methodManual + Pilot
Cooling methodWater / Air
Feed System
Feed stroke1.8 m
Feed force67 kN
Lifting force130 kN
Hole angle45°–90°
Hoisting speed115 m/min
Applicable rod length1 / 1.5 m
Rotary Power Head
Drive typeVariable displacement piston motor
Transmission typeGear drive
Max speed1500 rpm
Max torque1360 N·m
Max applicable rod diameter114 mm
Power head movementSwing / Side shift
Wireline Winch
Rope capacity1400 m (6 mm wire rope)
Empty drum lifting force14.5 kN
Full drum lifting force5.6 kN
Hoisting speed116 m/min
Clamp
Max clamping force130 kN
Through-hole capacity54–127 mm
TypeHydraulic clamp
Mud Unit
Mud pumpPlunger high-pressure pump
Drive typeHydraulic drive
Mud flow150 L/min
Mud pressure7 MPa
Mud Mixer
Drive typeHydraulic drive
Mixer speed1500 rpm
Mixing capacity1.2 m³/min
Module Reference Weight
Power unit180–260 kg
Control unit160 kg
Hydraulic oil unit (with oil)160 kg
Mud unit210 kg
Total weight1880 kg

Online Inquiry